Aug 282014
 

The interconnector”Iasi-Ungheni”gas pipeline is 43.2 km long and has an annual transportation capacity of 1.5 billion cubic meters,covering about one third of Moldova’s needs s. The first transit of natural gas from Romania will be undertaken on Sept.

 Leave a Reply

(required)

(required)

This site uses Akismet to reduce spam. Learn how your comment data is processed.